Phase 3 focuses on the removal of ancillary structures and buildings in the Alfa, Bravo, and Coca Test Areas. The six existing test stands and control houses will not be demolished at this time. Demolition in these areas involve obsolete structures such as inactive storage tanks, asphalt parking areas, and dormant office buildings. Phase 3 is occurring it two sub-phases. Phase 3-A will include the Alfa and Bravo Test Areas and Phase 3-B consists of the Coca Test Area.

Locations

Demolition Phase Updates

Phase 3-B Demolition Updates

Published 7/15/2019

View the daily progress of the demolition of the inactive hyrdogen tank located in the Coca Test Area. (no audio)

CEI - NASA Santa Susana Coca Hydrogen Ball Demolition

Video Descriptions



Phase 3-A Demolition Updates

Published 5/11/2018

These photos show the progress of the Phase 3-A demolition activities.

Alfa LOX Tank
This photo shows a large white tank on the right side of a road. An individual is seen performing abatement activities in preparation for demolition of the tank.
July 2017
This photo shows the former location of the Alfa LOX tank, the only remnants being dirt, hydroseed, and straw wattles to prevent erosion.
April 2018
Alfa Test Area facing West
This photo is looking east from Alfa Test Stand #3 toward Alfa Test Stand #2. A large structure and a staircase is seen at the base of the test stand.
July 2017
This photo is looking east from Alfa Test Stand #3 toward Alfa Test Stand #2. The structure shown and staircase in the previous photo is now gone, as is a large concrete slab.