Phase 4 demolition focuses on the removal of a subsurface concrete slab that remains in Area I LOX, as well as the retaining wall, concrete foundation, and spillway of the former Bravo Test Stand 3.
The photos below show the concrete removal at LOX in October 2018 as part of the Phase 4 demolition.